HIDROELECTRICA DONA JULIA This 18MW hydroelectric power plant is located adjacent to the Braulio Carrillo National Park in Costa Rica. It started Comercial operation in January 1999. | ||
HIDROELECTRICA PLANATAR The first private hydroelectric power plant to obtain the ISO 14 000 in Latin America. A 16MW plant which began operation on June 6 1995. | ||
HIDRO ENERGIA DEL GENERAL With an investment of US$80 million, this 40 MW run of the river hydroelectric power plant, began commercial operation in April 2006. It is located adjacent to the Braulio Carrillo National Park in Costa Rica, and its output can supply electricity for 40 000 houses. The amount ... read more | ||
MONTERREY LANDFILL GAS PLANT Monterrey Biogas Power Plant, was developed by SARET in a joint venture with GENTOR, a Mexican partner. It was financed by the World Bank, and has an installed capacity of 7,4MW. The total investment was US$11 million and it was able to offset 3 630 000 tons of carbon dioxide eq ... read more | ||
RIO AZUL LANDFILL GAS PLANT This is the second land fill gas power plant to be developed by Saret ,the first being the one developed in Monterrey Mexico. It is located at the main landfill in Costa Rica (already closed) and has an installed capacity of 3,6MW. It was able to offset a total of 550 000 tons of ... read more | ||
GUANACASTE WIND POWER PLANT This is a BOT wind power facility developed by SARET, JUWI and Econergy, with a total investment of US$120 million and 50MW of installed capacity; it went into commercial operation in 2009. All the original partners sold their interest to SUEZ Energy. |
HOME » BUSINESS UNITS » POWER GENERATION » IN OPERATION
IN OPERATIONWe have successfully executed a wide range of projects, which reflect our high level of expertise and our ability to work effectively across a wide cross section of sectors managing the vagaries of many different complex environments. |